I'm thinking about leveling out my yard, which is about 20ft long and sloped. My plan involves building a 24-inch high retaining wall and filling it with 8 yards of gravel. Before I dive into this project, I'm curious if this is too much work for just two people doing it ourselves. What should I keep in mind?
3 Answers
Are you planning to move all that gravel with wheelbarrows? That might take forever! I suggest renting a small excavator; they can be pretty affordable and will save you a ton of time. Just be careful on your grass and driveway—it can tear things up if you're not careful. Move slowly on softer ground!
That sounds like a solid plan—using a gorilla cart should help too. Just be sure to lay down a tarp if you're sliding it down the slope.
How high is that retaining wall you're planning? A short one like 24 inches can definitely be tackled by a couple of DIYers, but just remember that there might be local building codes to consider. Moving 8 yards of gravel is no joke, so just be prepared for some heavy lifting!
Check your local regulations before starting anything. Look for terms like 'setback'—they can have a big impact on your project. In the end, ask yourself what else you have going on. If you have the time to dedicate to this, it sounds doable!
Good tips! I've thought about using the cart to avoid more heavy lifting.